L68B1 Mast Section Points to note before tower installation

30-10-2019

In construction, the role of the tower machine is very important. Before installing the tower machine, several things need to be note


1. Determine the position of the tower and determine the principle that it can maximize the construction capacity of the tower and facilitate the entrance and installation and disassembly of the tower.


2. Determine the appropriate basic type. The pressure and concrete foundation should be made in advance and reach the standard number. The base ground endurance should not be less than 20T per square meter.


3. Open the field passage, clean up the scene, and find the basic plane


L68B1 Mast Section  L68B1 mast section is the best in this field

รับราคาล่าสุดหรือไม่ เราจะตอบกลับโดยเร็วที่สุด (ภายใน 12 ชั่วโมง)

นโยบายความเป็นส่วนตัว